{"id":9282,"date":"2019-08-08T15:38:00","date_gmt":"2019-08-08T20:38:00","guid":{"rendered":"https:\/\/mcshane-construction.com\/?post_type=portfolio&p=9282"},"modified":"2024-06-11T11:37:38","modified_gmt":"2024-06-11T16:37:38","slug":"digi-key-electronics","status":"publish","type":"portfolio","link":"https:\/\/mcshaneconstruction.com\/portfolio\/digi-key-electronics\/","title":{"rendered":"Digi-Key Electronics Product Distribution Center Expansion"},"content":{"rendered":"
McShane Construction Company added 2.2 million square feet of multi-level distribution space to Digi-Key\u2019s existing 800,000-square-foot distribution center. Large enough to fit 22 football fields, the facility incorporates 17,000 tons of steel, 1,860 pieces of precast concrete and 20 miles of conveyors. In addition to manufacturing and assembly space, the facility includes shipping and receiving docks and airlocks, multiple breakrooms, employee engagement areas and site walkways to encourage fitness. A 328′ steel bridge connects the expansion to Digi-Key\u2019s current headquarters.<\/p>\n